14/07/2026
Where do we start?!
The body is finally back from repairs, all completed by our good friend Craig Munro @ Extreme FIBRE To carry out repairs of this extent without a mould and make it look like nothing ever happened is an incredible achievement. An excellent job, as always.
Next up, Claus Mocanu came in to complete the repair patches and wrap, and the guys at the workshop finished by replacing the side windows.
Attention then turned to the engines. The team has been busy building both the race motor and a spare while the new Stage 7 heads are being checked over and assembled.
The pistons have been machined, the racks have been built, and the guys are now fitting a rack into the motor before completing the engine build with a final nut-and-bolt check.
Finally, it’s on to cutting the discs and grinding the floaters to assemble the clutch packs—all in preparation for Bug Jam!
It’s been a huge team effort, and we’re getting closer every day. We can’t wait to get back out there and see the car where it belongs. Stay tuned… Bug Jam is getting closer! 💪🏁
—————-
www.undertaker-racing.com
————————-
Flexiwaste Environmental Services Ltd
RotaRod
Craig Munro - Extremefibre
Claus Mocanu - vinyl wrapping services