08/21/2026
Tunnel is Open Again
Public Works has reopened the tunnel. The Mascoma River end of the tunnel funnels into a single lane that goes under scaffolding, to protect travelers from potential debris falling from the ceiling under the Hanover St Bridge section. The bridge itself will be replaced in 2027. Information about the bridge replacement project can be found at NH120 (Hanover Street) Bridge over NHRR Br....
Public Works has reopened the tunnel. The Mascoma River end of the tunnel funnels into a single lane that goes under scaffolding, to protect travelers from potential debris falling from the ceiling…