VINCI

Itinéraire Site Web

VINCI VINCI is a world leader in Concessions, Energy solutions and Concessions, employing more than 294,000 people

We design, build, finance and manage facilities that improve everyday life: the systems that transport us, the public and private buildings in which we live and work, the urban developments that create and improve our communities, and the water, energy and communication networks vital to human existence.

As a private sector company contributing to the development of society, VINCI successfully blends a business focus on today’s priorities with the long-term sustainability of its accomplishments and integrated concessions-construction business model.

---

Notre métier est de concevoir, construire, financer et gérer des équipements qui améliorent la vie de chacun : infrastructures de transport, bâtiments publics et privés, aménagements urbains, réseaux d’eau, d’énergie et de communication.

VINCI met sa performance de groupe privé au service de l’aménagement de la ville et du développement des territoires. Son modèle intégré de concessionnaire-constructeur conjugue ainsi les enjeux de court terme de l’activité de ses entreprises et les enjeux de long terme de ses réalisations.

HRBT : dernière ligne droite pour le génie civil ! En Virginie, dans l'Est américain, le chantier du Hampton Roads Bridg...
25/11/2026

HRBT : dernière ligne droite pour le génie civil !

En Virginie, dans l'Est américain, le chantier du Hampton Roads Bridge-Tunnel (HRBT) entre dans les dernières phases de ses principaux travaux de génie civil.

🚘 HRBT, c'est un projet de tunnel pour désengorger une route empruntée chaque jour par plus de... 100 000 véhicules.

Les travaux, menés par VINCI Construction aux côtés de FlatironDragados avancent bien : les principaux ouvrages d'art sont en voie d'achèvement et plusieurs basculements de circulation ont été réalisés, notamment côté Norfolk et sur les viaducs en mer. Autour des tunnels, les dernières dalles de couverture ont été bétonnées, permettant de passer progressivement aux raccordements techniques. Dans le bâtiment de ventilation sud, les travaux électriques ont également démarré et l'installation des principaux équipements peut désormais prendre le relais.

⚡️ Prochaine grande étape : la mise en service progressive des équipements électriques, puis de ceux du tunnel.

🛣️ Une fois en service, la liaison doublée contribuera à résorber la congestion de cet axe, dont dépendent le port, la base navale ainsi que les déplacements quotidiens de toute la région.

___
HRBT: the final stretch for civil engineering works!

In Virginia, on the US East Coast, the Hampton Roads Bridge-Tunnel (HRBT) construction site is entering the final stages of its main civil engineering works.

🚘 The HRBT is a tunnel project designed to relieve congestion on a road used by more than... 100,000 vehicles every day.

The works, led by VINCI Construction alongside FlatironDragados are progressing well: the main engineering structures are nearing completion and several traffic diversions have been implemented, notably on the Norfolk side and on the offshore viaducts. Around the tunnels, the final cover slabs have been concreted, allowing work to move gradually on to the technical connections. In the south ventilation building, electrical work has also begun and the installation of the main equipment can now take over.

⚡️ Next major milestone: the gradual commissioning of the electrical systems, followed by those in the tunnel.

🛣️ Once operational, the dual-tube link will help alleviate congestion on this route, which is vital for the port, the naval base and daily travel across the entire region.

Il en faut de l’huile de coude ! 💪En Allemagne, le pont « Vor Kiehren », qui enjambait l’Ahr, a été détruit lors des ino...
18/11/2026

Il en faut de l’huile de coude ! 💪

En Allemagne, le pont « Vor Kiehren », qui enjambait l’Ahr, a été détruit lors des inondations de 2021. Via Structure, via sa business unit NRW, a été mandatée par la commune de Hönningen pour le reconstruire.

Tout a commencé par la mise en place de pieux forés, puis la construction des fondations et des culées. En parallèle, la structure métallique a été livrée, assemblée et soudée sur place début août.

🏗️ Et le 20 août, place aux gros bras (ou plutôt aux grosses grues !) : la superstructure en acier de 168 tonnes a été mise en place avec succès ! Ont suivi les travaux de revêtement en bitume et la pose des garde-corps.

Le pont ouvrira en 2027 : piétons, cyclistes et véhicules agricoles pourront à nouveau traverser l’Ahr !

ℹ️ Projet piloté par VINCI Construction en Allemagne, avec l’appui de Julius Berger International pour la planification et la gestion de projet.

___
It’s going to take a lot of hard work! 💪

In Germany, the Vor Kiehren bridge over the River Ahr was destroyed in the 2021 floods. Via Structure, through its NRW business unit, was commissioned by the municipality of Hönningen to rebuild it.

Work began with the installation of bored piles, followed by the construction of the foundations and abutments. Meanwhile, the steel structure was delivered, assembled and welded on site in early August.

🏗️ On August 20, it was time to bring out the heavy machinery: the 168-tonne steel superstructure was successfully installed! Asphalt surfacing work and guardrail installation followed.

The bridge will open in 2027, allowing pedestrians, cyclists and agricultural vehicles to cross the Ahr again!

ℹ️ Project led by VINCI Construction in Germany, with planning and project management support from Julius Berger International.

📸 Thorsten Trütgen & Michael Streich, Altenahr Association of Municipalities

⏳ Des ouvrages durables, dans le temps et pour l'environnement ! Sous l'A61 au niveau de l'échangeur de Carcassonne se t...
17/11/2026

⏳ Des ouvrages durables, dans le temps et pour l'environnement !

Sous l'A61 au niveau de l'échangeur de Carcassonne se trouvent de grosses buses métalliques, qui permettent le passage de l'eau sous la chaussée. Ces tubes vieillissent, et il faut les maintenir en bon état.

Et pour cette opération, les équipes de Freyssinet ont innové, avec l'utilisation d'un mortier de comblement ultra-bas carbone pour tapisser l'intérieur d'une couche protectrice (en d'autres termes, elles ont réhabilité l'ouvrage par chemisage).

💡 Pourquoi c'est innovant ? Par sa formulation, cela permet de réduire significativement la quantité de ciment utilisée tout en conservant les mêmes performances techniques que les solutions habituelles.
L'innovation porte le nom de FOREVA® MC5+, et permet de réduire de 40 à 60 % les émissions de CO₂ par rapport à un coulis traditionnel.
L'essai étant concluant, il ouvre la voie à un déploiement sur d’autres chantiers !

Ce projet a été mené en partenariat avec Autoroutes du Sud de la France (ASF), le Cerema et l’Université Gustave Eiffel.

Sous la porte de Versailles, une ligne de métro sous étroite surveillance ! 🧐Lorsque des travaux ont lieu sur la surface...
16/11/2026

Sous la porte de Versailles, une ligne de métro sous étroite surveillance ! 🧐

Lorsque des travaux ont lieu sur la surface, ils peuvent avoir un impact sur ce qui se passe en-dessous.

Et c'est précisément ce que scrutent les équipes de Sixense (VINCI Construction).
Alors que le terminus du tramway T2 était en construction, elles ont étudié les mouvements souterrains, dans les tunnels de la ligne 12 du métro.

Afin de garantir la sécurité des infrastructures souterraines pendant toute la durée du chantier, elles ont déployé un dispositif de monitoring complet, comprenant notamment des capteurs d’inclinaison, des fissuromètres pour suivre l’évolution des structures ou encore un capteur de vibration.

C'est un exemple (parmi beaucoup d'autres !) que ce que fait Sixense pour la sécurité des ouvrages et la performance des projets urbains !

12/11/2026

Ce que l'on voit ici, ce sont des voûtes en béton.

Ce que l'on ne voit pas, c'est la coordination entre les équipes études, méthodes et travaux qui a permis de les assembler en seulement 10 semaines.

À Safi au Maroc, les équipes du Génie Civil Industriel de Sogea Maroc (VINCI Construction) ont franchi une étape majeure du projet MPH OSBL Storage Halls Solid Sulfur pour OCP Group, avec le montage des voûtes des deux halls de stockage.

Une opération de précision réalisée aux côtés de SOMALEV, mobilisant des grues de 600 tonnes et l'expertise de nombreux intervenants.

🎥 Regardez la vidéo pour découvrir ce chantier !

👏 Félicitations à toutes les équipes engagées sur le projet.

___
What we can see here are concrete arches.

What we cannot see is the coordination between the design, methods and construction teams that enabled them to be assembled in just 10 weeks.

In Safi, Morocco, the Industrial Civil Engineering teams at Sogea Maroc (VINCI Construction) have reached a major milestone in the MPH OSBL Solid Sulphur Storage Halls project for the OCP Group, with the installation of the arches in the two storage halls.

A precision operation carried out in collaboration with SOMALEV, involving 600-metric-tonne cranes and the expertise of numerous stakeholders.

🎥 Watch the video to find out more about this construction site!

👏 Congratulations to all the teams involved in the project.

VINCI Construction

05/11/2026

À quai, les bateaux s’arrêtent. Mais leurs moteurs, eux, doivent parfois pouvoir continuer à tourner ! 🚢
Même amarrés, ils ont toujours besoin d’énergie à bord.

La solution ? Les brancher directement au réseau électrique du port.
C’est le principe de l’OPS, une technologie déployée par VINCI Energies dans les ports de Tarifa et d’Algésiras, en Espagne.

Résultat : les moteurs peuvent être coupés, avec moins d’émissions atmosphériques et moins de bruit.
🔌 Dans le cadre du Pacte vert européen et du paquet législatif « Fit for 55 », l’alimentation électrique à quai doit devenir la norme dans les principaux ports européens d’ici 2030.

🎥 On vous explique tout en vidéo.

___
When ships are docked, they stop moving. But sometimes, their engines need to keep running! 🚢
Even while docked, ships still need power onboard.

The solution? Plugging them directly into the port’s electricity grid.
That’s the principle behind OPS, or Onshore Power Supply, a technology being deployed by VINCI Energies at the ports of Tarifa and Algeciras in Spain.

The result: ships can switch off their engines, helping reduce air emissions and noise pollution.
🔌 As part of the European Green Deal and the “Fit for 55” legislative package, shore-side electricity is set to become the norm in major European ports by 2030.

🎥 See how it works in our video!

04/11/2026

Bleu, vert, noir, brun.
Derrière ces couleurs se cachent des continuités essentielles au vivant !

Les trames écologiques permettent aux espèces de se déplacer, de se nourrir, de se reproduire et de s'adapter aux évolutions de leur environnement. Elles concernent aussi bien les milieux terrestres, aquatiques et souterrains que l'obscurité naturelle dont dépendent de nombreuses espèces nocturnes.

Chez VINCI, ces enjeux prennent des formes très concrètes, comme :

🔵 Avec Equo Vivo, des équipes restaurent des cours d'eau et des zones humides afin de recréer les conditions favorables à la biodiversité. En 2024, près de 20 km de cours d'eau et plus de 25 ha de zones humides ont ainsi été restaurés.

🟢 Le long de la LGV Sud Europe Atlantique, un vaste programme a été mis en œuvre pour préserver et restaurer les continuités écologiques. MESEA LGV SEA (VINCI Concessions)

⚫ À Mulhouse, la rénovation de 230 luminaires par les équipes locales de Citeos (VINCI Energies) contribue à préserver une trame noire favorable aux déplacements de la faune nocturne. Elle s’inscrit dans un plan lumière ambitieux portant sur 10 000 luminaires à rénover en deux ans, avec un objectif de plus de 70 % d’économies d’énergie.

🟤 À Nice, la réhabilitation de la place Goiran avec la solution Revilo® par VINCI Construction a permis d'améliorer la diversité des habitats tout en intégrant végétation, sols et gestion de l'eau.

Préserver la biodiversité ne consiste pas seulement à protéger des espèces ou des espaces naturels isolés. C'est aussi reconnecter ce qui a été fragmenté pour permettre au vivant de continuer à circuler, aujourd'hui comme demain. 🌿

Chez VINCI, on fait des pompes ! 💪Ou plutôt, on a contribué à les moderniser. Pas de sport au programme, mais plutôt la ...
30/10/2026

Chez VINCI, on fait des pompes ! 💪

Ou plutôt, on a contribué à les moderniser.
Pas de sport au programme, mais plutôt la modernisation de la station de pompage de Paddy's Run à Louisville, dans le Kentucky.

La rivière Ohio, qui borde Louisville, est capricieuse : c'est pourquoi cette station de pompage est cruciale, et en place depuis plus de 70 ans !

Le projet, auquel les équipes de Nicholson Construction ont participé, a visé à renforcer la résilience et la sécurité de l’installation afin de garantir la gestion des eaux et de prévenir les inondations.

La mission : concevoir et réaliser le système de soutènement nécessaire à la construction des nouveaux ouvrages, comprenant notamment une paroi moulée ancrée dans le substratum rocheux et un dispositif de butonnage interne.

📸 Soletanche Bachy
___

At VINCI, we’re getting pumped! 💪

Or rather, we modernised one.

No workout involved here: we’re talking about the Paddy’s Run Pump Station in Louisville, Kentucky.

The Ohio River, which runs alongside Louisville, can be unpredictable. That’s why this pump station has played a crucial role for more than 70 years.

The project, which Nicholson Construction teams contributed to, aimed to strengthen the resilience and safety of the facility, helping manage water levels and prevent flooding.

Their mission was to design and build the support system required for the new structures, including a diaphragm wall anchored into the bedrock and an internal bracing system.

📸 Soletanche Bachy
VINCI Construction

26/10/2026

🌉 Ça, c'est un pont. A priori, c'est juste un pont.

Mais ce qu'on ne devine pas, c'est tout ce qu'il se passe sur, et dans ce pont !

Les équipes Cofex-GTM Travaux Spéciaux (VINCI Construction), au sein d’un groupement mené par l’agence Eurovia de Lyon, ainsi que Cardem Centre-Est, Signature Centre-Est et l’agence Eurovia d’Aubervilliers - secteur Étanchéité, toutes filiales de VINCI Construction, et l’entreprise drômoise BSS, sont intervenues sur les viaducs de Pierre-Bénite sur l’autoroute A7 pour la direction interdépartementale des routes Centre-Est.

Le chantier inclut la réfection des rives des viaducs, la réparation des bétons dégradés, ainsi que la mise en place d’une protection cathodique par courant imposé des culées et le renouvellement du complexe d’étanchéité et de la couche de roulement.

📸 Kaptis – Benjamin Gremen

Parfois, les travaux sont essentiels. Mais il faut composer avec le terrain !🛣️ Au Maroc, le dédoublement des routes pro...
23/10/2026

Parfois, les travaux sont essentiels. Mais il faut composer avec le terrain !

🛣️ Au Maroc, le dédoublement des routes provinciales 4014 et 4025 a pour objectif de fluidifier les déplacements entre Rabat et Ain Aouda, notamment aux heures de pointe, tout en renforçant la connectivité régionale et en veillant à l'intégration de l'infrastructure dans son environnement.

Sur la section 4014, qui franchit la vallée de l'Oued Akrach, les équipes de Geoquest Maroc ont contribué à la réalisation d'un ouvrage Terre Armée de 1 200 mètres de long et jusqu'à 21,5 mètres de hauteur.

Pour les fans de technique : développée avec VIAS, le bureau d'études Atomas et l'expert géotechnique M. Ejjaaouani, cette conception repose sur un substratum rocheux et intègre des armatures raccourcies afin d'assurer la stabilité du talus tout en optimisant les volumes de déblais.

Pour les moins fans de technique : la vallée de l'Oued Akrach présente d'importants dénivelés qui compliquent la construction d'une infrastructure routière. Les équipes ont donc développé une approche sur mesure pour adapter le projet au terrain plutôt que l'inverse, tout en limitant son impact sur l'environnement.

👏 Bravo à toutes les équipes mobilisées sur ce projet !

Adresse

1973 Boulevard De La Défense
Nanterre
92757

Heures d'ouverture

Lundi 08:00 - 19:00
Mardi 08:00 - 19:00
Mercredi 08:00 - 19:00
Jeudi 08:00 - 19:00
Vendredi 08:00 - 19:00

Notifications

Soyez le premier à savoir et laissez-nous vous envoyer un courriel lorsque VINCI publie des nouvelles et des promotions. Votre adresse e-mail ne sera pas utilisée à d'autres fins, et vous pouvez vous désabonner à tout moment.

Raccourcis

Partager

Salles De Sport à proximité