Modeling the MN&S Railroad

Modeling the MN&S Railroad This page is planned to be a Blog of the construction of my model of the MN&S (and SOO LINE) Railroad.

I will focus on all facets of my Railroad, planning, research, construction all parts from individual models, benchwork, points and trackwork etc.

08/09/2026

Just a quick update, not much to say really.

EDIT: When I added the photo the YouTube link disappeared: https://youtu.be/vT4M7WApPuULast week I cleaned up the the la...
17/08/2026

EDIT: When I added the photo the YouTube link disappeared:

https://youtu.be/vT4M7WApPuU

Last week I cleaned up the the layout room and made the layout look a bit "pretty" for the local NMRA meeting, so I shot this before last week before the guys came around on Sunday.

07/08/2026

A quick layout update, that was supposted to go up yesterday...

07/08/2026

More new freight cars!

here is a link to the latest layout updatehttps://youtu.be/LmPk9CoipQoand below are photos of Chris and Alistair helping...
29/07/2026

here is a link to the latest layout update

https://youtu.be/LmPk9CoipQo

and below are photos of Chris and Alistair helping (leading) with the construction of the framework for the spirals and for the Hi Line loop.

I need a number 5Y switch for the next area I'm building.I have never built a switch without a Fast Tracks fixture, as I...
23/06/2026

I need a number 5Y switch for the next area I'm building.

I have never built a switch without a Fast Tracks fixture, as I only need one # 5Y I figured I have nothing to loose giving it a try.

So using a printout from the Fast Tracks website glued to a piece of 3mm MDF and a standard fixture for soldering the frog I built the switch in a couple of hours this afternoon.

Part 2 of Building Fast Tracks Bullfrog Turnout control.
15/06/2026

Part 2 of Building Fast Tracks Bullfrog Turnout control.

Just putting the finishing touches on the Bullfrog (almost). As you...

I decided to build one of the Fast Tracks Bull Frog Turnout control, as I have had a 5 pack sitting around for at least ...
15/06/2026

I decided to build one of the Fast Tracks Bull Frog Turnout control, as I have had a 5 pack sitting around for at least 10 years and now I'm getting close to needing to use them.

In this video I fumble thought test fitting the parts and working h...

Today I laid the very first track on the layout, this is the World Wide spur. I have the other section with the switches...
09/06/2026

Today I laid the very first track on the layout, this is the World Wide spur. I have the other section with the switches for World Wide and the Masonic Team Track on the work bench so I can lay the track on it as well, I can them permantly install them.

One glich I found was all the switches I have built in the past are code 70 and I'm laying this part of the layout in code 83 so for the first time in many years I'm building switches again.

Update 6/6/2026 - Backdrops - very delayed because I couldn't get it uploaded to Facebook so its on my YouTube channel
09/06/2026

Update 6/6/2026 - Backdrops - very delayed because I couldn't get it uploaded to Facebook so its on my YouTube channel

Enjoy the videos and music you love, upload original content, and share it all with friends, family, and the world on YouTube.

Address

Melbourne, VIC

Website

Alerts

Be the first to know and let us send you an email when Modeling the MN&S Railroad posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Featured

Share