08/12/2026
Hey everyone! It's been a little while since we gave a full on written update of where everything stands today, so we just wanted to provide a little bit of an update for everyone.
If you have seen from some of the stories we have been posting, construction work inside the facility is ongoing. New LED lights have been put up. The boards have been installed. We gave everything a fresh coat of paint. And this week we are getting the floor re-leveled. Once that is all done, we should have everything ready for the ice installation over Labor Day since our pipes all arrived this week!
From the non-ice side of things, we finally got our finalized mechanical and electrical drawings at the end of last week and are submitting for permitting by the end of this week. We are hoping that permitting should only take a few weeks since we aren't having much done to the place. It does mean the last thing we will have done is the buildout of the Warm Room, but we do think once we get permitting we should be able to breeze through that fairly quickly.
For our website, we have everything built out except for incorporating payments onto our site. We are currently working with a vendor for taking payments. Once we have that finalized, we will be able to start taking memberships, league sign ups, and bonspiel registrations!
That's all for now. Hopefully everyone is as excited as we are!