DuraEdge Products

DuraEdge Products Premium infield products, expert guidance, and professional installation for EVERY level of the game. Trusted by most MLB teams.

Official Infield Playing Surface of MiLB. Engineered Soil Technology® outperforms other methods because it is based on Soil Science, Not Guesswork. Grant’s E.S.T.® Program (patent pending) assesses the current state of the infield, then prescribes specific corrective measures to transform a poor infield into one with the highest performance possible.

08/31/2026

The batter's boxes, catcher's box, and pitcher's mound experience the most wear on a baseball field. Since every pitch begins in these areas, they're constantly absorbing foot traffic and require regular maintenance to keep the playing surface safe and consistent.

08/28/2026

Infield material shifts over the course of a season, and high spots can quietly build up if you are not watching for them. 

Watch the full episode of The Inside Edge using the link in bio!  
 

08/27/2026

A common mistake we see on infields: pushing water off the skin instead of working it in. Over time, this creates trenches that affect drainage and playability.

Watch the full episode of The Inside Edge: https://youtu.be/iQt9-wEeam4?si=72lr-03ecOLxOGA_

08/25/2026

A new episode of the Inside Edge is out now!

On this episode of The Inside Edge, former big league groundskeepers Paul Zwaska and Tom Burns break down the most common mistakes they see groundskeepers and coaches make on the infield skin.

Watch the full episode of The Inside Edge: https://youtu.be/iQt9-wEeam4

08/24/2026

No two fields are the same. Our Homefield crews evaluate each project on its own terms and apply the right techniques to solve it, backed by years of experience across every level of play.

08/21/2026

Base paths weren't always 90 feet apart. The original 1845 Knickerbocker Rules called for bases to be 42 paces apart. The now famous 90 foot distance wasn't officially adopted until 1857 after years of experimentation.

Richmond Flying Squirrels

08/20/2026

A full field renovation takes skill, planning, and the right materials at every stage. Watch a Homefield crew take this infield from teardown to game ready.

08/19/2026

A professional baseball infield contains roughly 11,300 square feet of exposed dirt. Between the infield skin, baselines, mound, and home plate area, that's about 200 to 220 tons of engineered infield mix.

Richmond Flying Squirrels

08/18/2026

A field renovation is only as good as the crew doing the work. Our Homefield crews follow proven techniques on every project, ensuring the field is built to perform for years, not just for one season.

08/18/2026

Address

149 South Broad Street
Grove City, PA
16127

Alerts

Be the first to know and let us send you an email when DuraEdge Products posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to DuraEdge Products:

Shortcuts

Share