05/01/2026
Hello Bushnell!
We’ve made serious progress and things are coming together fast. The fire alarm system is installed, and a large portion of the new electrical meter system is in place.
Right now, everything is hinging on one final piece a 12’ wire trough needed to complete the meter connections. It’s expected to arrive in Bushnell early next week.
Once that lands, we’re about 4–5 days out from final electrical and fire inspections.
We can feel the momentum building. Thank you for sticking with us get ready. The big moment is close.