Kent Ridge MTB Trail

Kent Ridge MTB Trail Currently the only MTB trail on local shores where riders have the option of tackling the lung-busti Please do not modify any of the trail features.

Just like the Kent Ridge trail itself, this page is maintained by volunteers. We will be posting updates on the trail conditions and any feedback from you the riders is greatly appreciated. Drop us a message instead if you discover any imminent danger on the trails, e.g. fallen trees. Do not litter the trails. Ride safe and above all, have fun!

25/01/2026

Clearing the trail as much as our batteries lasts!😅

The evening rain for past few days plus an extended one yesterday have washed away most of the loose hard clay at this s...
17/01/2026

The evening rain for past few days plus an extended one yesterday have washed away most of the loose hard clay at this section. The rut have been exposed again and a mud spot formed that is slippery.

Exercise care when riding it. We'll try and get more work done at this section.

We repaired the section after the repaired left berm on XC trail, where the hard clay which was rutted. That spot is ske...
10/01/2026

We repaired the section after the repaired left berm on XC trail, where the hard clay which was rutted. That spot is sketcy when its dry and even worst when wet. The off camber on riders right have been flattened to widen the path. The rut itself is now covered with loose hard clay chunks so be alert when riding there.

A section in the "Wormhole" where the rutted path is narrow and a RD killer have been widen a bit more. Hopefully no more dead RD after this.

[NOTICE] Closure of carpark B for upgrading works. Carpark B and part of Vigilante Drive leading to it have been closed....
12/12/2025

[NOTICE] Closure of carpark B for upgrading works. Carpark B and part of Vigilante Drive leading to it have been closed. Foot traffic in that area will still be accessable. Targeted completion is on April 2026.

Those driving to KR for rides, please take note and come early!

It was a productive trail day! We're able to repair some mud spots with rock amouring. Repaired a rutted fast section (s...
25/10/2025

It was a productive trail day! We're able to repair some mud spots with rock amouring. Repaired a rutted fast section (should be able to ride faster now :) )

A few more mud spots left to repair in the coming weeks. Enjoy the trails and ride safe.

25/10/2025

Trail work on XC line have completed for today. Its now open for you to shred

[NOTICE] There will be trail repair works at the XC trail this Saturday 25 Oct. The trail will be closed from 9am to 1pm...
24/10/2025

[NOTICE] There will be trail repair works at the XC trail this Saturday 25 Oct. The trail will be closed from 9am to 1pm. For the safery of everyone, please stay clear of the trail until the trail works have completed.

We will be having another trailday this Saturday 25th October together with NParks  to work on some problem areas on the...
21/10/2025

We will be having another trailday this Saturday 25th October together with NParks to work on some problem areas on the XC trail. Meet at carpark A or Evacuation point A by 8.30am.

If you're keen to join us, please fill up the participation form below

I wonder if we bring this kind of rocks arrangement to Kent Ridge MTB Trail rock garden, will riders get excited or comp...
26/08/2025

I wonder if we bring this kind of rocks arrangement to Kent Ridge MTB Trail rock garden, will riders get excited or complain even more......🤔

I think I may know the answers........

This week we are only able to patch up and fix the Siloso berm on the A-line. This berm has been in a bad state for the ...
20/07/2025

This week we are only able to patch up and fix the Siloso berm on the A-line. This berm has been in a bad state for the longest time!. By no means the work here is complete. But at least there is a usable bank to rail into the berm.

There was also some fixed up on the berm after that by unknown trail fairies, THANK YOU! We noticed and appereciate effort. Do let us know if you're doing any more work on the trail so we could coordinate our collective efforts 😍

The first round of trail works have  begun to a good start. We managed to get some work done to the first section of A-l...
13/07/2025

The first round of trail works have begun to a good start. We managed to get some work done to the first section of A-line till the Dragon berm. Some parts will need time to heal while others are getting trimmed and pruned.

We ask you to be patient as we work through the trail repair. If you're free on the weekends and want to help us out, do come down. We usually kick things off around 9am.

Greatest thank you and gratitude to those that turned up this weekend!

We'll be having trail works on the Downhill trail A-Line. In the next 6 to 8 weeks during weekends, trail works will be ...
08/07/2025

We'll be having trail works on the Downhill trail A-Line. In the next 6 to 8 weeks during weekends, trail works will be happening to repair and improve the trail features. During these times, A-Line will be closed to facilitate the works and safety of everyone.

We need volunteers and everyone is welcome to help out in any way possible. Do approach the people there and let them know you want to help. During the first few sessions we'll be moving soil from the XC trail entrance to the downhill trail.

Gloves will be provided for the day. Please come wearing a covered shoe and eyewear if available. Do drop us a message if you want to contribute or supply us anything for the trail days.

Address

Vigilante Drive
Singapore

Website

Alerts

Be the first to know and let us send you an email when Kent Ridge MTB Trail posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share