18/06/2022
The teams are expected to build a raft with the given materials which can carry 4 persons and which can sail fast.
By sharing tasks within the team, some team members design the raft while others design the sail of the raft. All teams are expected to finish their designs within a given time limit.
After all the designs have been finished, 4 persons from each team get on the rafts to pull the oars. The team which finishes the racetrack first is selected as the fastest team of the day.