07/09/2026
A little Valkyrie upgrade incoming… 👀🔨
& by little, we mean HUGE.
If you’ve been wondering what that mountain of flooring is doing in the corner of reception😭😂
This Sunday night we’re replacing the gym floor with new, more durable gym matting throughout the main training space.
Our current flooring simply hasn’t stood up to the level of footfall and training it’s had since we opened - which, while slightly inconvenient, is a pretty good problem to have🥹🤍
Upgrading the flooring has become a priority because it’ll give us:
1. The best training surface for our Valkyrie girlies
2. A more durable surface for our growing community
3. Something much easier to clean and maintain (for all our clean gyals🧼✨)
4. To ensure Valkyrie looks and feels as good as possible
It’s a BIG job, so Mark Alexander and the team will basically be pulling an all-nighter to get it done with as little disruption to you as possible😂
The gym will therefore be CLOSED this Sunday from 6PM and will reopen Monday at 6AM.
AND while we’re talking upgrades…
Our new lighter dumbbells are arriving later this week! 🏋🏼♀️ (because lateral raises are humbling enough and a 2.5kg jump is criminal x)
The delivery time was a little longer than we were willing to wait, so naturally… Mark is going to collect them himself😂 his terrible patience works to all our advantage so tysm.
We’re constantly listening, tweaking and investing back into Valkyrie to make your training space better.
Thank you for bearing with us while we get this one done.
It will be so worth it🖤
Always building. Always improving. ⚔️
R&M