17/04/2026
Alot has been happening since haul out.
Mast - spreaders were at different angles so new through bar fitted so all at 10° now rather than one set at 10° and one at 5°. Mast wiring replaced and put in the conduit so it'll be quieter now too.
Then there was the "small" beam repair. It turns out that we had to replace 2.5m of it. Significantly more work than we had imagined and alot of learning. Luckily lots of knowledge and advice from the Multihull Centre, even if they don't like to admit it, they know alot about wood too.
It's all coming together but still more to do having found rot in the aft beam today. Still hoping to be back sailing again in a week or two.