10/09/2026
The drilling of a new fuselage panel is a critical step in the structural repair process, requiring precise positioning, accurate hole preparation and careful alignment with the existing aircraft structure.
Each stage is performed in accordance with approved repair data, ensuring the new panel is prepared for proper installation and structural integrity is fully restored.