19/06/2026
A big day today with the fairway bunker being reshaped and then the CapillaryFlow liner installed. The weather forecast for rain this weekend meant it was more advantageous to get the capillary installed in the fairway bunker.
The 3 x green side bunkers have all had their EcoBunker edges installed by the team from Centaur Asia Pacific.
The fairway bunker required considerable extra work including rerouting of an old drain and irrigation line as well as removal of a lot of unsuitable soil material.
Sand installation is now rescheduled to early next week with turf to be added towards the end of next week.