05/16/2026
Not exactly the prettiest project — but definitely one of the most important.
Work is mostly complete to replace the main sewer line at Old Bridge Little League, and as these photos show, this has been a major infrastructure repair. Trenches, equipment, plumbing work inside and outside the building — the whole deal. It’s been a long week!
But this is what it takes to keep a 71-year-old complex running for our players and families.
And when you arrive Saturday, everything will look close to normal. But, as if we are one of those house renovation shows, there are some finishing touches in the morning with hopes of the restrooms and kitchen being back up and running.
Thank you to everyone who has contributed to our donation drive so far. Your generosity is already helping us address real needs at the complex, including work like this.
We are still working toward our fundraising goal, so if you are able to contribute, every donation helps us keep improving OBLL.
Thank you for supporting our players, our families and our league.