10/25/2026
Going out on the trail later this morning to install the red mud season closure signs on the KVT.
Before any of you lose your minds, the trail is NOT closing today. The state ATV program, for some reason, has asked us to install permanent mud season signs that can be switched between "open" and "closed" easily.
It's also a "cost savings" measure. It seems we're (not MAATV, but clubs collectively, around the state) using too many of the red signs. I can't speak for other clubs, but we recycle the signs we staple up and use them over and over.
20 minutes each to install the newfangled brackets or 20 seconds each to restaple a sign... whatever...
The point here? This would be easier with a second set of hands. Reply to this message if you're bored and want to help.
Don't message the page please. Meta ( Facebook for business) sucks, and I can't open messages there (which is where your direct messages go) without a PC. Can't get them with my phone.
~trailmaster