01/08/2026
SWDP trail enthusiasts,
My name is Justin Kestler, and I will be taking over Trail Coordinator duties for SWDP. I’d like to thank Hank for all his hard work as TC, as well as anyone else that’s ever donated their time to helping build and maintain the trail system, thank you!
Current Trail Updates:
- There is about 4 miles of single track (according to Trail Forks). Main Loop, Stillwater, Little Monster, Abu Run, and Tamale.
- The flyover bridge and wood berms on Abu Run are mandatory right now. Use caution if the wood is wet. A sneak line is on the list of things to do, reach out to me if this is something you want to take on.
- I am working on some new lines on the downhill at the beginning of Tamale. The idea is to create a few downhill option lines with a connection back to the last climb (by passing the rest of the loop) so you can lap the downhills before finishing the rest of the loop.
- The Stillwater loop could use some love but is fully rideable. Use caution on the bridge at the end, it’s a little wobbly. I will be working on a solution, reach out to me if you have any ideas.
- Little Monster and the new-ish run out trail are all good to go but are still fairly fresh and could use more tire traffic to pack In the soft areas.
Overall the trail is in good shape but there is always maintenance needed to keep everything draining and running smooth. Please report any fallen trees or other hazards through the DMs on this page. Stay tuned for a workday sometime in late February/March, I’ll create an event when I nail down a day. Until then the best way to help the trail Is to use It, so get out and ride!
Feel free to reach out to me through the DM’s on this page with any questions/comments/concerns/trail reports.
See y’all on the trail,
Justin